Habitat for humanity house for Pell City Army Veteran couple Needs to be done by September 12
*WALLS
- dry wall needs to get mudded
*PAINT
Inside
-walls need to get prepped for primer
-ceiling needs primer
-walls need primer
-wall needs paint
-ceiling needs paint
Outside
-sides and back of need another coat of paint
-front needs to get prepped for paint
-front needs paint
*BATHROOM
-make floor level
-floor needs tiled
-needs painted
-tub or shower installed
-sink installed
-fix bathroom door
*FLOORS
-floor needs to get installed in living room, bedroom, hallway, and utility room.
-tiling needed in bathroom and kitchen
*KITCHEN
-install counters
-install cabinets
-install sink
-install oven
-install refrigerator (still needed)
*OUTSIDE
-install handrails
-replace old porch boards
-install back light switch
-wrap house
*WINDOWS
-wrap windows
-trim windows