Bathroom fitting. Including removal of two layers of tiles, plasterboard repairs plastering walls and ceiling including stopping existing black spots of mould from keep appearing, removal and refit of existing aqualisa shower, tiling 3 walls and floor in a 2 metres x 2.5 metres room, fitting p shape bath, basin with vanity unit and a toilet. We have been quoted for 10 days work which given the time taken last time, 8 years ago, seems reasonable. Will invite to quote only if significantly less than the quotation we have had, no point wasting the fitters time or mine as the chap we have already seen seems to be ideal. Professional finish required from filter with excellent References. What does the group consider an expected charge for labour before I give this guy the go ahead ?