Tim S.
wrote:
Had them to make my master
bathroom a.d.a compliant. They redid
my master bathroom floor with tiles
and told me my floor joists made it
uneven but I wouldn't notice when they
done. I said my other floor wasn't
uneven (he said it was I just didn't
notice it) but I noticed his tile work it
has uphill and downhill slopes he said
the tiles was reason they are
rectangular but if he knew that he
couldn't make it not noticeable why
not say I can't do it instead continue
on. I have a traumatic brain injury and
don't like confrontation so I accept it
but I have drop foot and it's up enough
that it catches my toes when I walk on
it barefoot so have to wear shoes on
it. Then he did my shower floor with
tiles and I didn't get to use the shower
for awhile because it took awhile to
get my door and when I got my door
my shower won't drain,well it will drain
out next day( I called him to see about
getting it fixed but won't return my
call.) Even though he signed
paperwork through the v.a. Saying he
would guarantee his work and
craftsmanship for a yr. He did come
back and fixed a area when the tiles
came loose, but i still didn't know
shower wouldnt drain at that time or
maybe he would fix it. But since he
won't return my call or attempt to fix it
after 5 months don't think he will I
even told a guy that works with him
and he said he would tell him. He did
other work at time that is o.k so far.
Wish I could post pictures to show
floor and water in shower. Oh 1 of the
windows he put in wont lock after I
tilted it out to clean it. He put in 2.